Yahoo Web Search

Search results

  1. There are 4 ways to get from Nariman Point to Worli by train, bus, taxi, or car. Select an option below to see step-by-step directions and to compare ticket prices and travel times in Rome2rio's travel planner.

    • Package 1
    • Package 2
    • Package 4
    • Current Status
    Scope: Priyadarshani Park to Baroda Palace (3.82 km)
    Lanes: 8 lanes
    Contractor: Larsen & Toubro (L&T)
    Contract Value: Rs. 7,489 crore (P1 and P4)
    Scope: Baroda Palace near Haji Ali to the Worli end of Bandra Worli Sea Link (2.23 km)
    Lanes: 8 lanes
    Deadline: 48 months (4 years)
    Contractor: HCC – HDC JV (Hindustan Construction Company – Hyundai Development Corporation)
    Scope: Princess Street Flyover to Priyadarshani Park (3.93 km) with twin 1920m tunnels under Malabar Hills
    Lanes: 6 lanes (2 x 2 lanes + 1 emergency)
    Contractor: Larsen & Toubro (L&T)
    Contract Value: Rs. 7,489 crore (P1 and P4)

    First TBM breakthrough on Package 4 was recorded on January 10, 2022. The project’s Phase 1 is expected to be completed and opened in January 2024. Video of 2nd breakthroughin May 2023: Here’s a video from December 2022: Page last updated: December 27, 2023. Have a question or spot an error? Let me know here.

  2. This is expected to reduce travel time between Nariman Point and Kandivali from over two hours to less than 40 minutes. Real estate experts said that the infrastructure connector is a...

    • Vandana Ramnani
  3. May 15, 2024 · The girders installed today were placed on the route from Nariman Point to Worli. Each girder weighs 2,500 metric tons and measures 143 meters in length, 31.7 meters in width, and 31 meters in height.

    • Mahima Pandey
  4. The 10.58km coastal road that will connect Nariman Point to Bandra Worli Sea Link has twin tunnels of 2.07km, connecting Girgaum Chowpatty to Malabar Hill.

  5. Jan 15, 2014 · The Bandra-Versova sea link is a northwards extension to the Worli-Bandra sea link, and represents the last leg of the link which starts from Nariman Point (see highlight chart). The 9.9-km link is proposed to be a public private partnership (PPP) project.

  1. People also search for