  1. The bridge, which cost €60 million, is named for Irish writer Samuel Beckett (1906–1989). It was officially opened to pedestrians on 10 December 2009 by Dublin Lord Mayor, Emer Costello and to road traffic at 7 am the following day. The bridge won Engineers Ireland's 'Engineering Project of the Year' in 2010. Criticism

  2. The Samuel Beckett bridge is a cable stayed, steel box girder structure with a span of 123m over the Liffey. Designed by Santiago Calatrava in conjunction with Roughan O’Donovan (Dublin); the bridge was built by Graham Hollandia Joint Venture Contractors.

  3. 39 million € Location. Dublin, Ireland. Introduction. The Samuel Beckett Bridge is one of the many bridges that crosses over the River Liffey in Dublin, Ireland. It joins Sir John Rogerson’s Quay on the south side to Guild Street and North Wall Quay in the Docklands area.

    • how much did the samuel beckett bridge cost to install the floor1
    • how much did the samuel beckett bridge cost to install the floor2
    • how much did the samuel beckett bridge cost to install the floor3
    • how much did the samuel beckett bridge cost to install the floor4
    • how much did the samuel beckett bridge cost to install the floor5
  4. It is a cable-stayed bridge, whose main structure consists of 25 straps front and 6 rear, with a runway of 124 meters long, 27 meters wide and a single pylon 40 feet tall. The cross section of the board is a box girder with cantilever ribs on each side that can accommodate four lanes of traffic.

    • Dublin, Ireland
  5. Dublin’s Samuel Beckett Bridge, designed by internationally renowned architect Santiago Calatrava cost €60 million and took ten years to complete.

  6. Sep 3, 2011 · As the Samuel Beckett Bridge is a swing bridge, two main conditions needed to be designed for. the bridge in the ‘open position’, with no vehicular loading and no support at the ends. the bridge in the ‘closed position’, subject to live loadings and support at the embankments (see Figure 3).

    • Jerry Cutter, John W. Flanagan, Philip Brown, Mario Rando, Gaute Mo
    • 2011
  7. The 120 metre bridge has a cable-stayed, steel box girder structure and the estimated total cost of its construction and installation was €59.95 million.