Yahoo Web Search

Search results

  1. An agreement was finally reached in the state treaty of the 4 December 1850, whereby Württemberg was granted the right to build the direct StuttgartMühlackerBrettenBruchsal route (Württemberg Western Railway) even on Baden territory, while Baden was permitted to build and operate the Karlsruhe–Mühlacker line, which ran partly in ...

  2. Lastly, the agreement made possible the JagstfeldNeckarelzEberbach connection desired by Württemberg, which was completed by Baden in 1879. Other state railways were constructed in the Allgäu region between Kißlegg and Wangen (1880) and further into the Bavarian Hergatz (1890), and between Leutkirch and the Bavarian town of Memmingen (1889

  3. By means of a state agreement between the German Empire and the states, the Württemberg State Railways (the Royal title had been dropped after the abdication of King Wilhelm II on 30 November 1918) transferred into Reich ownership on 1 April 1920, and, together with the other former state railways of Bavaria, Prussia, Saxony, Baden ...

  4. After the founding of Deutsche Reichsbahn in 1920, the Baden main line along with the rest of the Grand Duchy of Baden State Railway became part of the Reichsbahn, so in addition to the Baden-built locomotives and locomotives built by the other former state railways, newly developed steam locomotives were used on the Baden main line.

  5. Not until the merger of the Baden Post Office into the Reichspost in 1872 did a separate railway administration emerge in Baden: the Grand Duchy of Baden State Railways. Development of the main lines

  6. From States to Region: Baden-Württemberg, 1871-1951.

  7. People also ask

  8. Royal Württemberg State Railways (Königlich Württembergische Staatseisenbahn or K.W.St.E.) Grand Duchy of Baden State Railways (Großherzoglich Badische Staatseisenbahn or G.Bad.St.E., 1840–1920) Grand Duchy of Mecklenburg Friedrich-Franz Railway (Großherzoglich Mecklenburgische Friedrich-Franz-Eisenbahn or M.F.F.E.)