Yahoo Web Search

Search results

  1. People also ask

  2. Dec 26, 2022 · Linn Cove Viaduct Visitor Center: Talk to a ranger for information and to grab a map. Closed for repair; check the opening schedule for reopening information. Linn Cove Viaduct: Drive across the last section of the Parkway to be completed, a true engineering feat.

  3. Feb 10, 2018 · ASHEVILLE, N.C. (AP) — The popular Linn Cove Viaduct in the Blue Ridge Parkway is closing for several months for road resurfacing and bridge repairs. Local news outlets report the viaduct — or bridge — will be closed from March 1 to May 24, reopening in time for the Memorial Day weekend.

  4. The Linn Cove Viaduct is a 1,243 feet (379 m) long, concrete segmental bridge which snakes around Grandfather Mountain in western North Carolina.

  5. Feb 8, 2018 · LINVILLE — The National Park Service on Feb. 7 announced that the Linn Cove Viaduct on the Blue Ridge Parkway for surface repaving and bridge maintenance from March 1 through

  6. Feb 7, 2018 · A Park Service announcement said the viaduct and Parkway will be closed from March 1 through May 24, Memorial Day weekend. A traffic detour will be in place from milepost 298.6 - Holloway Mountain Road - to milepost 305.1 - U.S. 221.

  7. Feb 8, 2018 · The National Park Service has announced it will close the Linn Cove Viaduct for repairs this spring. Here is the official release from the Blue Ridge Parkway: Iconic Linn Cove Viaduct to Receive Facelift during Upcoming Closure

  8. Mar 24, 2022 · Quick Facts. As the last piece of the Parkway to be completed, the Linn Cove Viaduct was a peak of Blue Ridge Parkway engineering and environmental protection. Completed in 1983 at a cost of almost $10 million, the Linn Cove Viaduct is 1,243 feet long and contains 153 segments weighing 50 tons each.

  1. People also search for