  1. Find wind data and information in Ohio, including maps, capacity, ordinances, and more in these areas: Capacity & Generation. U.S. Wind Turbine Database. Maps & Data. Wind Education & Training. Policies & Incentives.

  2. Sep 3, 2024 · The Lone Star States has more than 19,000 active wind turbines, according to the most recent report from the U.S. Wind Turbine Database. Top 10 states with the highest number of wind turbines State

    State
    Wind Generation May 2024 (mwh)
    Wind Generation June 2024 (mwh)
    Monthly Percentage (%) Change
    Maine
    153
    173
    13.07
    Maryland
    32
    35
    9.38
    Massachusetts
    15
    16
    6.67
    Michigan
    731
    787
    7.66
    • Background of The Blue Creek Wind Power Facility
    • Blue Creek Wind Energy Plant Details
    • Gamesa Turbines For The Blue Creek Wind Farm
    • Blue Creek Contractors

    The project development began in late 2006. A diligence study was conducted in the project area in the second half of 2008 to assess the potential environmental and regulatory constraints. The necessary land and land rights for the installation of wind turbineswere acquired between March 2007 and November 2009. Wildlife studies were undertaken betw...

    The overall area of the Blue Creek wind-powered electric generation project is approximately 40,500 acres. The project area covers the towns of Hoaglin, Tully and Union in Van Wert County, as well as the towns of Benton, Blue Creek and Latty in Paulding County. The wind farmconsists of 152 Gamesa G90 wind turbine generators (WTG) of 2MW each. These...

    Gamesa G90-2MW WTGs have a rotor diameter of 90m. Rotor’s swept area is 6,362m² and its rotational speed varies between 9rpm and 19rpm. It weighs approximately 36t. The turbine features three blades, each measuring 44m in length. Each blade weighs 5.8t and is made of pre-impregnated epoxy glass fibre and carbon fibre.

    Iberdrola Renewables was responsible for construction management, wind assessment, O&M, and site assessment and development. The wind turbine generators and associated components were supplied by Gamesa. The general contractor for balance-of-plant (BOP) was Blattner Energy. PAR Electrical was the electrical contractor, while Dashiell Corp provided ...

  3. Wind turbines continued to grow in size and power, with the average nameplate capacity of newly installed wind turbines at 3 MW—up 9% from 2020 and 319% since 1998−1999. The combined health, climate, and grid-system benefits of wind are more than 3 times its levelized cost of energy.

  4. Jul 3, 2019 · The Scioto Ridge wind farm will be installed with a total of 75 wind turbines from Siemens Gamesa, which has already received an order to supply 63 SG 3.4-132 turbines and nine SG 2.6-114 onshore wind turbines for the project.

  5. Jun 19, 2012 · The Blue Creek Wind Farm is Ohio's largest commercial wind project, with a capacity of 304 megawatts (MW). Featuring 152 Gamesa 2-MW turbines, the project represents a $600 million investment and will provide many economic benefits to the local community.