  1. INSTALLATION & MAINTENANCE GUIDE. FAILURE TO READ AND UNDERSTAND THIS MANUAL PRIOR TO USE MAY RESULT IN INJURY OR DAMAGE. WELCOME. Griffin Armament® has been satisfying customers for nearly two decades with innovative and cutting edge sound suppressor technology.

  2. Certain pipeline construction projects require rigid restrained joint pipe for use on bridges or other elevated structures. The MECH-LOKjoint combines the proven mechanical joint with a rigid restraining system.

  3. Sewer & Drainage Materials. Griffin Pipe – Sewer & Drainage Ductile Iron Pipe. Griffin’s ductile iron sewer pipe and fittings are ideal for all tough applications.

  4. Find expert-curated Griffin Pipe products from the #1 US plumbing supplier and top distributor of HVAC, waterworks, and MRO products.

    • 2.3 Abbreviations used throughout these specifications have meanings as follows:
    • 4.1.7 Restrained Joint Fittings
    • 21 -
    • 41 -
    • 1.1 The protection of the public water supply against contamination or pollution is of the essence of this Work and is of more importance than any other single feature herein; and the CONTRACTOR
    • 1.3 The work intended to be performed under this Contract shall include the furnishing and the installation of pipes, fittings, valves, hydrants and appurtenances, including wet and tapping connections and other structures, all as described on the Bid Form and Plans and to perform all other work incidental thereto. Items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the principal bid item requiring such work and/or materials, and the cost thereof shall be considered to be included in the bid price for the principal items. All work shall be performed in a professional manner, consistent with good workmanship practices, and shall meet total satisfaction and approval of the ENGINEER. The ENGINEER or his designated representative (INSPECTOR) may not be on the job site every hour that the CONTRACTOR is performing work. During the days the CONTRACTOR is allowed to perform WORK per the Contract Documents, the CONTRACTOR shall start WORK after dawn each day and complete the day’s WORK by dusk each day. If the City in which the WORK is performed has a more restrictive work or noise ordinance, that requirement shall be followed. Some WORK may be required to be performed at night, weekends, or low water usage times as directed by the Contract Documents, Construction Plans, or the ENGINEER.
    • 1.8 The CONTRACTOR shall, unless otherwise specified in Sections 1.4 or 1.5 above, furnish all materials, labor, tools, and equipment necessary to complete the project. The CONTRACTOR
    • 6.4.4 City of Sherwood - When City of Sherwood streets are to be cut, crossed, blocked and/or obstructed, the CONTRACTOR shall prepare permit request(s) with a MUTCD traffic control plan(s) designed for the designated work zone for the work. The CONTRACTOR
    • 6.9 DUST CONTROL & CLEANING OF STREETS - The CONTRACTOR shall take steps to
    • 7.1 The approximate locations of subsurface structures known to the OWNER are shown on the Plans. This information is shown for the guidance of the CONTRACTOR and the OWNER does not guarantee the accuracy or correctness of the locations of such structures as shown. Furthermore, there may be structures that are not shown. It shall be the responsibility of the CONTRACTOR to satisfy himself as to the actual location and nature of subsurface structures. The CONTRACTOR
    • 8 – PROTECTION AND RESTORATION OF VEGETATION
    • 11.6 All foreign matter or dirt shall be removed from the inside of the pipe and appurtenances before lowering into the trench and the pipe interior shall be kept clean during and after laying. At all
    • 16.8.2.1
    • 16.8.2.3
    • 17.1 Meter settings shall be installed where shown on the Plans and/or as directed by the OWNER.
    • 24.3.1.1
    • P = Test pressure (psi); 225 psi or as specified by the ENGINEER
    • 37 - DAMAGE TO DISTRIBUTION SYSTEM
    • 38 - CLEAN-UP OF JOB SITE

    AASHTO AC ANSI ASTM AWWA CF CI CS or CC DI DFT FIP FCF IP MIP American Assoc. of State Highway & Transportation Officials Asbestos Cement American National Standards Institute American Society for Testing Materials American Water Works Association (Latest Revision) Copper Flare Gray Cast Iron AWWA (Mueller Corporation Stop) Thread Ductile Iron Dr...

    When restrained joint ductile iron pipe is specified on a project, the fittings shall also be restrained joint designed for the restrained joint system used on the pipe. Mechanical joint or push-on fittings with retainer glands are not an equal to restrained joint fittings.

    PROTECTION AND RESTORATION OF VEGETATION CLASSIFICATION OF EXCAVATION EXCAVATION AND PREPARATION OF TRENCH INSTALLATION – GENERAL JOINTING MECHANICAL JOINT PIPE AND FITTINGS JOINTING PUSH-ON JOINT PIPE AND FITTINGS JOINTING FLANGED PIPE AND FITTINGS JOINTING PVC PIPE JOINTING CONCRETE PRESSURE PIPE AND FITTINGS METER SETTINGS INSTALLATION OF VALVES...

    TUNNELING, BORING AND INSTALLATION OF ENCASEMENT STRUCTURES CONCRETE THRUST BLOCKS AND ANCHOR COLLARS CONCRETE MIX PLACEMENT AND FINISHING CLASS “A” CONCRETE BACKFILL AND BEDDING TYPE 4 AND TYPE 5 BEDDING REPLACEMENT OF SPECIAL SURFACES TEMPORARY REPAIRS TO SPECIAL SURFACES CONNECTIONS TO DISTRIBUTION SYSTEM FILLING PIPELINES CLEANING LARGE PIPELIN...

    shall insure the protection thereof. Any contamination or pollution resulting from acts or omission of the CONTRACTOR shall, in addition to other remedies, be cause for termination of any Contract without notice. 1.2 The design, materials, and construction of water facilities shall conform to the latest revision of the Ten States Standards except ...

    Certain work, including but not limited to placement of reinforcement steel, placement of concrete, valve operation, pressure and leakage tests, cut and plugs, etc., must be inspected and approved by the ENGINEER before start, completion, or backfill. The CONTRACTOR shall coordinate the inspection of this type of work with the ENGINEER. The CONTR...

    shall clear the pipe line right-of-way; remove pavement as necessary; excavate the trench and pits to the required dimensions; construct and maintain all approaches required for traffic control; sheet, brace, and support adjoining ground or structures where necessary; handle all drainage or ground water; guard the site; load, unload, haul, distribu...

    shall submit the plan(s) to the City of Sherwood Engineering Department and obtain approval before any work commences (including Traffic Control). approved permit(s) for the work. The only exception is a true emergency where life or property is in immediate danger. Permits should be obtained no later than the next business day after said emergenc...

    eliminate dust and mud along streets during the construction period. If, in the opinion of the ENGINEER, dust or mud is excessive, the CONTRACTOR shall immediately take action to resolve the problem. Dust, mud, dirt, and other debris tracked onto paved streets shall be removed daily. The OWNER will furnish unmetered water (where available) neces...

    shall comply with the Arkansas One-Call provisions. No excavations shall be made prior to calling Arkansas One-Call and giving proper notification. Not all utility companies are members of the Arkansas One-Call system. Therefore, the CONTRACTOR is advised to contact all non-member utilities and arrange to have their utilities located on within t...

    8.1 The CONTRACTOR shall not remove or disturb any vegetation except that required for the execution of the work. 8.2 Unless otherwise specified in these specifications, in the Plans, or directed by the ENGINEER the CONTRACTOR shall replace all sod, grass, shrubs, bushes, trees, and flowers, and landscaped areas disturbed or removed, that are locat...

    times when pipe laying is not actively progressing (i.e. extended delays during the work day, overnight cessation, weather delays, difficult trenching conditions, etc.), the open ends of the pipe shall be closed and made watertight by installing a plug or cap of sufficient design to prevent trench water, mud, foreign matter, and dirt from entering ...

    All soil and other material shall be removed from the joint recess and from the pipe on each side of the joint. A suitable cloth, reinforced paper or plastic wrapper, at least seven (7) inches in width and of sufficient length to reach around the exterior circumference of the pipe, shall be placed around the pipe, centered on the joint opening, an...

    Grout and cement mortar shall be protected to prohibit freezing during the curing period. Any joint showing excess shrinkage or cracking after curing shall be cleaned and remade. Backfill shall not be commenced before grout achieves initial set.

    Installation shall be as per the Standard Details. Meter settings shall be installed at a location that is outside areas of vehicular traffic and still accessible to Central Arkansas Water personnel. Meter setters shall be installed in a horizontal and plumb position within the meter box and at a depth to provide the required space between the to...

    Sidewalks, street surfaces, curbing, gutters, ditch paving and driveways

    B. The maximum leakage per hour for non-jointed pipe (welded steel, welded PVC, welded HDPE, etc., and containing gasket-jointed connections for fittings, valves, etc.) shall be as calculated from the following formula: ___

    During the course of construction under this contract, whether by accident or carelessness, the OWNER'S distribution system may be damaged, the CONTRACTOR shall be held responsible for this damage, and shall make immediate repairs at his expense. In event service has been disrupted, immediate repair operations shall be continuous and around the cl...

    The CONTRACTOR shall remove all materials, equipment, tools, temporary structures, barricades, trees and other vegetation that have been cut or have died as a result of the work from both public and private property along the job site. There shall be no burning on the job site unless approved, in advance, by the ENGINEER and other agencies involve...

    • 2MB
    • 119
  5. Mechanical Joint Assembly. s recommended for proper assembly of all mechanical joints. Lubrication and additional cleaning should be provided by brushing both the gasket and plain end with soapy water or pipe lubricant just prior t.

  6. Griffin Push-On Joint Ductile Iron Pipe The TYTON JOINT ® and FASTITE JOINT ® designs incorporate a single rubber sealing gasket assuring a tight, perma- nent seal.