  1. Mar 6, 2024 · Full closures of C-470 to the US 85 off- and on-ramps. Full closure of US 85 between County Line Road and Blakeland Drive in Highlands Ranch. C-470 through traffic will be rerouted around the interchange via the off- and on-ramps. Significant delays are expected. Northbound and southbound US 85 will be detoured around the interchange; What Can ...

  2. Mar 4, 2024 · Around-the-clock work, detours and closures will take place from 7 p.m. March 7 until 5:30 a.m. March 13. For the safety of crews and the traveling public, there will be no C-470 access to or from U.S. 85, and through traffic on C-470 will be delayed as crews demolish the old U.S. 85 bridge over C-470. A local detour will be in place for ...

  3. People also ask

  4. Apr 19, 2024 · This project will improve safety, mobility, and traffic operations by widening (from four to six lanes) and reconstructing a segment of US 85 (South Santa Fe Drive) from Highlands Ranch Parkway, extending north of the C-470 Interchange to Dad Clark Gulch (which is located approximately 1,200 feet north of County Line Road). Major US 85 ...

  5. Current County Road Closures. This interactive map shows road closures on county and township roads. Updates on unplanned road closures are made dynamically as supervisors report in. Planned road projects are updated during the normal work week. Click on a symbol on the map for more information about its reason for closure.

    • Project Benefits
    • Work Schedule
    • Traffic Impacts
    Reducing congestion with an additional through lane in each direction of US 85 and auxiliary lanes at key intersections
    New roadway pavement and installation of raised medians to reduce conflicts throughout the corridor
    New below-grade trail crossings at US 85 for the C-470 and High Line Canal Trails and a new shared path on the east side of US 85
    Multi-modal improvements including new bus stop shelters
    Work will last from Fall 2022 through Fall 2025
    Working hours 6 a.m. through 6 p.m., Monday to Saturday
    Overnight and weekend work is expected

    Motorists and pedestrians can expect the following impacts during the period of construction: 1. Daily lane closures in both directions US 85 between County Line Road and Highlands Ranch Parkway from 9 a.m. to 3 p.m. 2. Lane closures on C-470 on- and off-ramps at US 85 3. Lane shifts on US 85 4. Reduced speeds through the work zone 5. Narrowed lane...

  6. Oct 30, 2023 · To ensure driver and worker safety during bridge and ramp reconstruction work, the following closures, requiring detours, will be in place: Eastbound C-470 off-ramp to US 85 from 7 p.m. Friday, Nov. 3, through 5 a.m. Monday, Nov. 6. Detour: Eastbound off-ramp traffic will continue east on C-470 and exit on Lucent Boulevard (Exit 18), use the ...

  7. Feb 11, 2022 · Construction on this second – and final – phase of the Waterton Road extension project began in September 2021. This 2.5-mile extension, from Rampart Range Road to Moore Road, will complete the connection to US Highway 85. Phase 1 of the project, the construction of a 2.8-mile, two-lane roadway between Airport Road and Moore Road, was ...