Search results
14 hours ago · The South Terminal Complex will be built adjacent to the Orlando International Airport Intermodal Terminal, which was completed in late 2017 and is connected to the existing terminal by a Automated People Mover (APM) line. At full buildout, the South Terminal Complex will have 120 new gates between two terminals, C and D.
- 96 ft / 29 m
- Orlando, Florida, United States