Yahoo Web Search

Search results

  1. 1 day ago · The current Terminal 1 opened in 2004, replacing Aeroquay One (also referred to as the original Terminal 1) and Terminal 2. Measuring over 346,000 square metres (3,724,000 sq ft), Terminal 1 is the largest airport terminal in Canada and the 12th largest in the world by floor space.

  2. 1 day ago · There is a 15-minute grace period in the short term parking lot. The short term lot is closer to the terminal building, though the long term lot generally provides lower rates. Several area hotels participate in the airport's "Park and Fly" program, in that they offer special room rates and free shuttle service for airport patrons.

  3. 4 hours ago · Terminal 1 is the first terminal built and was opened in 1985. It is located on the southern side of the airport, opposite Terminal 2. Terminal 1 has 3 sub-terminals, each equipped with 25 check-in counters, 23 aerobridges, 5 baggage carousels, and 7 gates. It has the capacity to handle 9 million passengers per annum.

  4. 1 day ago · Toggle navigation. Hard Rock Hotels Loyalty Program. 1.855.537.4606; Ubícanos

  1. People also search for