Search results
Ricardo Bofill
- Architect: Ricardo Bofill, Taller de Arquitectura Location: Barcelona, Spain Client: AENA Gross Floor Area: 525,000 sqm Date of Completion: 2009...
www.archdaily.com › 124997 › barcelona-airport-new-terminal-ricardo-bofill
People also ask
What was the first airport in Barcelona?
How many parking spaces are there at Barcelona Airport?
Where is the train station in Barcelona?
A new base was established at the airport in September 2010. The airport has 3 runways, two parallel, nominated 06L/24R and 06R/24L (the latter opened in 2004), and a cross runway 02/20.
Apr 4, 2011 · Architect: Ricardo Bofill, Taller de Arquitectura Location: Barcelona, Spain Client: AENA Gross Floor Area: 525,000 sqm Date of Completion: 2009 Photographs: Courtesy of Ricardo Bofill.
- Sebastian Jordana
Situated between the Mediterranean Sea and the existing Terminal 2, completed by RBTA in 1992 for the Barcelona Olympic Games, T1 was conceived as a singular dynamic space under a huge vibrant roof; one space divided into two main areas, the processor and the piers.
The architecture of the interior of the terminal, known as the “Sky Centre”, blends straight and curved forms. The terminal is one of the largest civil engineering projects recently undertaken in Europe.
Situated between the Mediterranean Sea and the existing Terminal 2, completed in 1992 for the Barcelona Olympic Games, T1 was conceived as a singular dynamic space under a huge vibrant roof; one space divided into two main areas, the processor and the piers.
Ricardo Bofill Taller de Arquitectura. Transport + Infrastructure › Airport. The mission of the new terminal is to serve as a communications gateway linking barcelona with the rest of europe and the world, to promote passenger mobility ….
Ricardo Bofill Taller de Arquitectura as Architects. Lluis Carbonel View Gallery. Located between the existing 1992 Olympic airport (T2) and the Mediterranean sea, the T1 is Barcelona´s new terminal, with a capacity for thirty million passengers a year.