Yahoo Web Search

Search results

      • A traffic advisory is in effect this weekend due to the closure of the Brooklyn Bridge and track work on mass transit. The Brooklyn Bridge will be completely closed to Manhattan-bound traffic throughout the weekend. The bridge will reopen at 6 a.m. Monday before the morning rush hour begins.
      brooklyn.news12.com › the-brooklyn-bridge-will-be-closed-throughout-the-weekend-due-to-construction-34786077
  1. People also ask

  2. May 11, 2024 · Single-lane in each direction will be closed Monday to Friday from 9 pm to 6 am next morning to facilitate structure painting on the bridge. At least one travel lane in each direction will remain open at all times. These closures will continue through May 31, 2024. Brooklyn/Queens Grand Street Bridge over Newtown Creek

    • Municipal Parking Lots

      Brooklyn. Avenue M Municipal Parking Field 1624 Chestnut...

    • Real Time Traffic Cameras

      NYC DOT's Traffic Management Center (TMC), located in Long...

    • Vision Zero

      10 Years of Vision Zero playlist description: Series of...

    • Bridges

      It was demolished in 1917. The oldest bridge that is open to...

    • Employment

      Employment Opportunities with NYC DOT. NYC DOT is a vital...

  3. May 3, 2024 · In Brooklyn, closures include part of the BQE and the lower level of the Verrazano. In the Bronx, closures include parts of 3rd Avenue and the Manhattan-bound side of the 3rd Avenue Bridge. Click here to find all closures across the city. Rain is in the forecast, but the tour will go on, rain or shine.

  4. •. Updated 3,555 days ago. Share: A traffic advisory is in effect this weekend due to the closure of the Brooklyn Bridge and track work on mass transit. The Brooklyn Bridge will be completely closed to Manhattan-bound traffic throughout the weekend. The bridge will reopen at 6 a.m. Monday before the morning rush hour begins.

    • Manhattan
    • Manhattan/Queens
    • Manhattan/Brooklyn
    • Manhattan/Bronx
    • Bronx
    • Brooklyn/Queens
    • Brooklyn
    • Queens

    This street will be closed from 9 am to 3 pm Monday to Friday through 5/10/24 to place boom lift on side for facade inspection. This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/26/24 to excavate and install conduit for system reinforcement. This street will be closed from 5 am to 9 am Saturday and/or Sunday t...

    Single-lane Queens-bound south upper roadway will be closed 24/7. Double-lane Queens-bound south upper roadway will be closed Monday to Friday from 9:30 am to 3 pm and from 8 pm to 5 am next morning, and Saturday from 5 am to 2 pm. During second lane closure, one Manhattan-bound upper roadway lane will reverse to service Queens-bound traffic. Queen...

    Single-lane at a time will be closed on upper and lower roadways Tuesday from 9 pm to 3 am next morning to facilitate maintenance. At least one lane of traffic in each direction will be maintained at all times. Pearl Street entrance ramp to eastbound (Brooklyn-bound) Brooklyn Bridge (Ramp B) will be closed Monday to Friday from 11 pm to 5 am next m...

    Right lane in both directions will close Monday to Friday from 7 am to 3 pm and alternating center lane in either direction will close Monday to Friday from 10 am to 2 pm through May 10, 2024, to facilitate rope cable cleaning, machinery repairs, and electrical conduit installation. Alternating sidewalk closures will be in effect. Single-lane Manha...

    This street will be closed from 9 am to 4 pm Friday through 5/10/24 for concrete pours and material deliveries. This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/1/24 for use of knuckle boom and concrete pump operations. This street will be closed from 7 am to 4 pm Monday to Friday through 5/22/24 to facilitat...

    Single-lane in either direction will be closed Monday to Friday from 11 pm to 5 am next morning, through May 3, 2024, to facilitate bridge maintenance. At least one lane in each direction will be maintained at all times.

    Single-lane Queens-bound and the Atlantic Avenue entrance ramp to Queens-bound Brooklyn-Queens Expressway will be closed Monday to Friday from 12 am to 5 am through May 10, 2024, to facilitate core extraction and testing. Queens-bound will be closed from Saturday 2 am to Monday 4 am, to facilitate critical repairs of the triple cantilever structure...

    Single-lane in both directions on the Belt System Lauralton Parkway underpass will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 1 am to 5 am through May 22, 2024. One lane in each direction will be maintained. These closures are necessary to facilitate bridge underdeck rehabilitation. Shoulder and a...

  5. Jul 19, 2023 · The Brooklyn Bridge survived a close call Wednesday morning after it was struck by a crane that damaged an I-beam underneath its iconic Gothic frame. The accident came as the crane was being...

  6. The iconic Brooklyn Bridge connects Lower Manhattan and Brooklyn Heights. Known for its stone arches, the Brooklyn Bridge supports six lanes of vehicles (no trucks) and a shared pedestrian and bicycle path. As of 2018, an average of over 116,000 vehicles, 30,000 pedestrians and 3,000 cyclists travel over the Brooklyn Bridge each day. Bridge Facts

  7. Apr 7, 2022 · Two lanes of the Brooklyn Bridge were shut down during peak rush hour traffic this Thursday morning, while the NYPD worked to get an individual off of the bridge suspension cables above the...